Project: R10-C12 ETS Works
Client: PAL Technology
Location: Al Reem Island - Abu Dhabi
Scope of Work: Design, Supply & Installation of Energy Transfer Station piping works including installation of 8 Nos Heat Exchanger Plates with all required valve packages with Electrical & Instrumentation, Insulation & Cladding works @ Primary Side
Status: Completed
Project: CP2 & CP3 Dubai South
Client: Tabreed
Main Contractor: Amana Pipeline Construction LLC
Location: Dubai South - Dubai
Scope of Work: Fabrication, Fit-up, welding and Field Joint Insulation of Underground Chilled Water Network Piping up to Ø 42" of Pre Insulated CS Pipe & Fittings
Status: Completed
Project: One JBR
Client: Dubai Holdings
Main Al Bonian International
Location: JBR - Dubai
Scope of Work: Fabrication, Welding, Installation of Energy Transfer Station (Primary Side) and Pump Room with Chilled Water Piping Network for Residential Towers (One JBR)
Status: Completed
Project: Jebel Ali Airport - PCA
Client: Cavotec Middle East FZE
Location: Jebel Ali - Dubai
Scope of Work: Engineering, Installation & Testing Commissioning of Ground Support Airport Equipment (Pre Conditioned Air Units with Pop-Up Pits System)
Status: Completed
Project: MEERA Shams - ETS Works
Client: PAL Technology
Location: Al Reem Island - Abu Dhabi
Scope of Work: Design, Supply, Installation, Testing & Flushing of Energy Transfer Station piping works including installation of Heat Exchanger Plates with all required valve packages with Electrical & Instrumentation, Insulation & Cladding works @ Primary Side for 2 Residential Towers
Status: Completed
Project: Al Zahia City Centre - CHW Works
Client: Majid Al Futtaim
Main Contractor: CCC / A&P Paraskevaides & Partners LLC
Location: Sharjah
Scope of Work: Fabrication, Fit-up, Welding, Installation & Insulation of Complete Chilled Water piping System including Pump Room works
Status: Completed
Project: Al Zahia City Centre - Project Management
Client: Majid Al Futtaim
Main Contractor: CCC
Location: Sharjah
Scope of Work: Project Management of Testing & Commissioning Works for Chilled Water System
Status: Completed
Project: E40-C27 - ETS Works
Client: PAL Danat Cooling
Location: Al Reem Island - Abu Dhabi
Scope of Work: Design, Supply, Installation, Testing & Flushing of Energy Transfer Station piping works including installation of 3 Nos Heat Exchanger Plates with all required valve packages @ Primary Side
Status: Completed
Project: RT2-C18 - ETS Works
Client: PAL First Cooling
Location: Al Reem Island - Abu Dhabi
Scope of Work: Design, Supply, Installation, Testing & Flushing of Energy Transfer Station piping works including installation of 4 Nos Heat Exchanger Plates with all required valve packages @ Primary Side
Status: Completed
Project: Danat Al Ain Resort - Steam Boiler System Works
Client: Danat Al Ain Resort
Location: Al Ain
Scope of Work: Design, Supply & Installation of 2 Nos Steam Boilers 2112 Kw Heat Output with Hot Water Calorifier 5000 Ltrs Storage Capacity with Tanks and Accessories Including steam water, diesel and condensation piping & valve package works
Status: Completed
Project: Dubai Land - CHW Works
Client: EMPOWER
Main Contractor: Overseas AST
Location: DLRC - Dubai
Scope of Work: Fabrication, Fit-Up and Welding of CHW Underground Piping up to Ø 36" of Pre Insulated CS Pipe & Fittings
Status: Completed
Project: IMPZ - CHW Works
Client: EMPOWER
Main Contractor: Overseas AST
Location: IMPZ - Dubai
Scope of Work: Fabrication, Fit-Up and Welding of CHW Underground Piping up to Ø 40" of Pre Insulated CS Pipe & Fittings
Status: Completed
Project: Master Building - Dubai Harbour
Main Contractor: Amana Steel Buildings
Location: Dubai
Scope of Work: Fabrication, Fit-up, Welding and installation of Steal Structure Beams, Piping and Cover Plates for Spine and Fins @ Dubai Harbour
Status: Completed
Project: Dubai Health Care City - CHW Works
Client: EMPOWER
Main Contractor: Overseas AST
Location: DHCC - Dubai
Scope of Work: Fabrication, Fit-Up and Welding of CHW Underground Piping up to Ø 48" of Pre Insulated CS Pipe & Fittings
Status: Completed
Project: City Center - CHW Works
Client: Majid Al Futtaim
Main Contractor: Al Bonian International
Location: Dubai
Scope of Work: Supply & Installation of Complete Chilled Water System including, Pipes up to Ø 24", Insulation, Chillers and Pumps, Valves & Strainers for Shopping Mall
Status: Completed
Project: Dubai Int'l Airport - Upgradation
Client: Cavotec Middle East FZE
Location: Dubai
Scope of Work: Engineering, Installation & Testing Commissioning of Ground Support Airport Equipment (Pre Conditioned Air Units with Pop-Up Pits System)
Status: Completed
Project: Jebel Ali Airport - 400Ks
Client: Cavotec Middle East FZE
Location: Jebel Ali - Dubai
Scope of Work: Engineering, Installation & Testing Commissioning of Ground Support Airport Equipment (400Hz Power System Package - 400Hz Converters with Pop-Up Pits System)
Status: Completed
Project: Bahrain International Airport - Fuel Hydrant System Design
Client: Undisclosed
Location: Bahrain
Scope of Work: Engineering Works for Fuel Farm and Fuel Hydrant System at the Airport (Aviation)
Status: Completed
Project: EPSCO Labour Camp
Client: EPSCO LLC
Location: Dubai Investment Park - Dubai
Scope of Work: Design, Supply & Installation of Chilled Water Pre-insulated Underground Piping & ETS/Pump Room Works
Status: Completed
Project: Cebu Int'l Airport - Testing & Commissioning Works
Client: GMR / Megawide
Location: Cebu - Philippines
Scope of Work: Complete Testing & Commissioning works for Fuel Hydrant System at Cebu Mactan International Airport
Status: Completed
Project: Bollywood Expansion - CHW Works
Client: DXB Project & Management Services LLC
Main Contractor: GCC Contracting
Location: Jebel Ali - Dubai
Scope of Work: Design, Supply, Fabrication, Welding of Pre-Insulated Pipes with Flow Stops, Hot Tapping, Testing & Flushing works for Bollywood Expansion Project @ Dubai Parks
Status: Completed
Project: RR2-C19 - ETS Works
Client: PAL Cooling Holding
Location: Al Reem Island - Abu Dhabi
Scope of Work: Design, Supply, Installation, Testing & Flushing of Energy Transfer Station piping works including installation of 2 Nos Heat Exchanger Plates with all required valve packages @ Primary Side
Status: Completed
Project: AMMROC - Ground Support Works
Client: AMMROC / Cavotec Midlle East FZE
Location: Al Ain
Scope of Work: Engineering, Installation & Testing Commissioning of Ground Support Airport Equipment (16 Nos of Pre Conditioned Air Units with Pop-Up Pits System with full piping, electrical and instrumentation works)
Status: Ongoing
Project: Dubiotech - CHW Works
Client: EMPOWER
Main Contractor: Overseas AST
Location: Arjan - Dubai
Scope of Work: Fabrication, Fit-Up and Welding of CHW Underground Piping up to Ø 40" of Pre Insulated CS Pipe & Fittings
Status: Completed
Project: Carrefour - Pump Room Works
Client: Majid Al Futtaim Hypermarkets LLC
Location: Marina Mall - Abu Dhabi
Scope of Work: Modification, Supply & Installation of new valves (DRV's & Gate Valves) with accessories for Pump Room @Carrefour Abu Dhabi Marina Mall
Status: Completed
Project: Sharjah Int'l Airport - Fuel Hydrant System Works
Main Contractor: Amana Steel Buildings
Location: Sharjah
Scope of Work: Fuel Hydrant Pits and Piping Fabrication, Fit-up, Welding & Installation Works for DJ-279 Construction of New Remote Aircraft Hardstand Aprons, Related Taxiways and Associated Works
Status: Ongoing